DEPA calls for RAE to prioritize Kipoi, Abelia compressor stations

Gas utility DEPA has underlined the gas-supply security importance of two prospective compressor stations in Kipoi, northeastern Greece, and Abelia, in the mid-north, urging RAE, the Regulatory Authority for Energy, to prioritize their development.

The two projects, on a RAE list of infrastructure projects for preventive action, are expected to significantly improve energy supply security in Greece over the mid and long-term by facilitating the transportation process of natural gas.

DEPA stressed the importance of the two compressor stations in a letter forwarded to RAE’s public consultation procedure on its preventive action plan.

The two compressor stations are vital for grid-connection and gas-flow purposes concerning the prospective Alexandroupoli FSRU and an underground gas storage facility (UGS) planned for development at an almost depleted offshore natural gas field in South Kavala, DEPA pointed out in its letter.

Also, the Abelia compressor station is needed to ensure hydraulic gas-flow sufficiency from north to south, via the TAP project, DEPA noted.

Both compressor station projects feature in gas grid operator DESFA’s ten-year development plan covering 2021 to 2030.