Authority issues new wave of RES licenses for 27 projects, 491 MW

RAE, the Regulatory Authority for Energy, has just issued 27 RES producer certificates for as many projects, taking the tally of this new certificate, part of the government’s RES licensing simplification process, to 33.

The authority issued a first wave of new producer certificates towards the end of last month.

The 27 new producer certificates, issued by RAE yesterday, concern eight wind energy parks offering a total capacity of 171.15 MW, 17 solar energy projects with a total capacity of 318.48 MW, and two small-scale hydropower projects offering 2.1 MW, their overall capacity being 491.73 MW.

Four photovoltaic facilities planned by Consortium Solar Power in central Greece’s Fthiotida and Larissa areas, totaling 284 MW, are standout projects in terms of scale.

Enel Green Power was also well presented in this licensing round with a total of six projects, all solar, three of these in Xanthi, northeastern Greece, totaling 7.07 MW, and one each in Rodopi (2.72 MW), Kozani (3.6 MW) and Ioannina (1.99 MW).

As for the two small-scale hydropower projects just issued licenses, one, offering a capacity of 1.54 MW, belongs to the Koryfi K2 Energiaki company, the other, 0.6 MW, to Hydroilektriki.